Advanced Downtime & Loss Analysis
Root Cause • Cost Impact • Repetitive Failures • Action Tracking
Total Downtime
6.4 hrs
Unplanned
4.2 hrs
Planned
1.4 hrs
MTBF
128 hrs
Loss Cost
₹48,600
Downtime Classification
Pareto – Top Loss Contributors
Machine-wise Downtime (Minutes)
Shift-wise Downtime
Repetitive Failure Tracker
| Machine | Reason | Occurrences | Total Time | Trend |
|---|---|---|---|---|
| CNC-01 | Tool Failure | 5 | 92 min | Increasing |
| Assembly-03 | Sensor Fault | 3 | 78 min | Stable |
Recommended Actions:
• Replace CNC-01 tool holder (High priority)
• Review sensor calibration for Assembly-03
• Add PM check for vibration every shift
• Replace CNC-01 tool holder (High priority)
• Review sensor calibration for Assembly-03
• Add PM check for vibration every shift
Downtime Event Log (Audit Ready)
| Machine | Reason | Start | End | Duration | Shift | Operator |
|---|---|---|---|---|---|---|
| CNC-01 | Tool Failure | 10:15 | 10:47 | 32 min | A | OP-12 |
| Assembly-03 | Sensor Fault | 08:20 | 09:05 | 45 min | B | OP-07 |